3 E Network Commences Strategic Procurement for Mikkeli AI Data Center Project

HONG KONG, Feb. 03, 2026 — 3 E Network Technology Group Limited (Nasdaq: MASK, “3 E” or the “Company”), a business-to-business (“B2B”) information technology (“IT”) business solutions provider advancing toward next-generation artificial intelligence (“AI”) infrastructure solutions, today announced that subsequent to signing a long-term land lease agreement with the City of Mikkeli, the AI Data Center Project in Finland has formally initiated the procurement process for critical equipment and Long Lead Items (LLIs). This development signifies the project’s rapid shift from the strategic planning phase to the tangible construction preparation stage.

Dr. Tingjun Yang, CEO of 3 E, noted that the strategic rationale behind this construction stems from the AI data center being a cornerstone for the Company to connect digital ecosystems and deploy artificial intelligence infrastructure. Dr. Yang stated: “AI computing requires unparalleled benchmarks in power density, thermal efficiency, and responsiveness. By launching supply chain processes in tandem with the permitting phase, we aim to secure high-quality hardware resources early, with the goal of enabling the facility—once operational—to support High-Performance Computing (“HPC”) workloads and Large Language Model (“LLM”) training.”

Dr. Yang stressed that this procurement is designed to align with the Company’s construction philosophy of “Green and Low-Carbon, Modular Assembly, and Extreme Energy Efficiency.” To ensure compliance with Finland’s strict building regulations and energy efficiency criteria, current supply chain planning efforts will focus on five key infrastructure domains:

  • Industrialized Prefabricated Construction: The Company intends to procure prefabricated structural components engineered to meet Finnish fire and structural standards, including steel frameworks and modular envelope systems. This modular assembly approach is aimed at enhancing construction efficiency and facilitating the phased delivery of the data center’s physical structure.
  • Modular Critical Power Infrastructure: The Company plans to prioritize prefabricated power skids and modular UPS systems. Through the planned procurement of integrated power distribution units, the Company seeks to support a decoupled power system design and enable scalable deployment to accommodate future capacity expansion.
  • Hybrid Cooling Solutions for AI: The Company intends to assess liquid-cooling-ready coolant distribution units (“CDUs”) to address the expected thermal demands of next-generation AI chips. This approach is projected to be coordinated with the deployment of air-cooling solutions leveraging Nordic natural cooling conditions, with the aim of supporting an efficient hybrid cooling architecture.
  • High-Performance Optical Interconnects: To support the communication needs of large-scale AI computing environments, the Company plans to evaluate high-capacity optical cable systems and interconnect components compatible with spine-leaf architectures. The objective is to support low-latency data transmission architectures suitable for GPU-based computing workloads.
  • IoT Infrastructure for 3 E Intellisight™ Platform: To support the rollout of the 3 E Intellisight™ Smart Operations Platform, the Company intends to prioritize the evaluation and procurement of underlying sensor arrays and edge computing gateways. This infrastructure is designed to support the collection and integration of operational data into the 3 E Intellisight™ Platform for data-driven operations management.

Currently, 3 E has initiated supply chain selection and technical validation processes, and is developing a vendor qualification system centered on engineering adaptability and regulatory compliance. All candidate technical solutions are expected to undergo thorough compliance reviews in line with Finnish national building standards, environmental permitting requirements, and industrial delivery standards. Through these processes, the Company aims to foster a high-standard, high-precision professional supply chain ecosystem. This approach is intended to ensure adherence to strict industrial standards throughout the construction process and position the project as a benchmark for digital infrastructure development in the Mikkeli region.

About 3 E Network Technology Group Limited

3 E Network Technology Group Limited is a business-to-business (“B2B”) information technology (“IT”) business solutions provider, dedicated to becoming a next-generation artificial intelligence (“AI”) infrastructure solutions provider. It upholds the industry principle of “AI and energy symbiosis” and demonstrates strong vision in the field of energy investment. The Company’s business consists of two primary portfolios: the data center operation services portfolio and the software development portfolio. For further details, please visit the Company’s website at https://3emask.com/.

Forward-Looking Statements

Certain statements in this announcement are forward-looking statements. These forward-looking statements involve known and unknown risks and uncertainties and are based on the Company’s current expectations and projections regarding future events that the Company believes may impact its financial condition, results of operations, business strategy, and financial needs. Investors can identify these forward-looking statements by terms or phrases such as “approximates,” “assesses,” “believes,” “hopes,” “expects,” “anticipates,” “estimates,” “projects,” “intends,” “plans,” “will,” “would,” “should,” “could,” “may” or similar expressions. The Company assumes no obligation to publicly update or revise any forward-looking statements to reflect subsequent events or circumstances, or changes in its expectations, except as required by law. Although the Company believes the expectations expressed in these forward-looking statements are reasonable, it cannot guarantee such expectations will be realized, and the Company cautions investors that actual results may differ materially from the expected results. Investors are encouraged to review other factors that may affect the Company’s future results in its registration statement and other filings with the U.S. Securities and Exchange Commission.

For more information, please contact:

3 E Network Technology Group Limited

Investor Relations Department

Email: ird@3emask.com

Website: https://3emask.com/